City of Fort Collins
Client: City of Fort Collins Location: Landings Park, Fort Collins, CO Service: Playground Renovation Details: We placed 125 tons of sand into a playground to refresh the existing material. The Bedrock Slinger placed the sand into a large pile and a combination of a skid and manual labor moved it into place at 3 […]
City of Westminster
Client: City of Westminster Location: Oakhurst Park, Westminster, CO Service: Playground Renovation Details: We removed more than 3,560 square feet of sand from an existing, multi-level playground. Using steel plates to protect the turf, we replaced the sand with 175 cubic yards of EWF to create a safe, ADA accessible playground surface.
Thompson School District
Client: Thompson School District Location: Ivy Stockwell Elementary, Berthoud, CO Service: Playground Renovation Details: During a four-day playground renovation project to create an ADA accessible playground, we removed 15 inches of sand, then installed 6 dry wells for drainage, placed 3 inches of pea gravel, and topped it off with 750 cubic yards of […]