(970)-776-8150

City of Fort Collins

Sand placed into a playground to refresh the existing material by bedrock slingers

  Client: City of Fort Collins Location: Landings Park, Fort Collins, CO Service: Playground Renovation Details: We placed 125 tons of sand into a playground to refresh the existing material. The Bedrock Slinger placed the sand into a large pile and a combination of a skid and manual labor moved it into place at 3 […]

City of Westminster

Slinger trucks replaced sand of a multi-level playground with EWF to create a safe, ADA accessible playground surface

  Client: City of Westminster Location: Oakhurst Park, Westminster, CO Service: Playground Renovation Details: We removed more than 3,560 square feet of sand from an existing, multi-level playground. Using steel plates to protect the turf, we replaced the sand with 175 cubic yards of EWF to create a safe, ADA accessible playground surface.

Thompson School District

Bedrock Slingers playground renovation project to create an ADA accessible playground replacing sand with pea gravel and EWF for safe, easily accessible play for all students.

  Client: Thompson School District Location: Ivy Stockwell Elementary, Berthoud, CO Service: Playground Renovation Details: During a four-day playground renovation project to create an ADA accessible playground, we removed 15 inches of sand, then installed 6 dry wells for drainage, placed 3 inches of pea gravel, and topped it off with 750 cubic yards of […]

Place an Order

Material needed and estimated quantity
When the job needs scheduled for
Type of Work Needed(Required)

Get a Free Quote

  • This field is for validation purposes and should be left unchanged.