(970)-776-8150

City of Fort Collins

Sand placed into a playground to refresh the existing material by bedrock slingers

 

Client: City of Fort Collins

Location: Landings Park, Fort Collins, CO

Service: Playground Renovation

Details: We placed 125 tons of sand into a playground to refresh the existing material. The Bedrock Slinger placed the sand into a large pile and a combination of a skid and manual labor moved it into place at 3 inches deep over the entire playground.

Place an Order

Material needed and estimated quantity
When the job needs scheduled for
Type of Work Needed(Required)

Get a Free Quote

  • This field is for validation purposes and should be left unchanged.