Client: GC Builders

 

Location: Residence near Horsetooth Reservoir – Fort Collins

 

Service: Material Placement with Slinger Truck

 

Details: We installed a perimeter drain around and backfilled this hard-to-access foundation with 500 tons of Pea Gravel and 100 tons of topsoil in a matter of just a few days.

Ground Solutions filling a perimeter drain in Colorado with gravel and topsoil using slinger trucks
Ground Solutions and Bedrock Slingers installed a perimeter drain around and backfilled this hard-to-access foundation with 500 tons of Pea Gravel and 100 tons of topsoil
Backfilled perimeter drain with Pea Gravel and topsoil in Fort Collins CO