Client: Sedona Hills HOA

Location: Sedona Hills subdivision in Loveland, CO

Service: Placing 315 tons of ¾” roadbase

Details: Bedrock utilized our DAHMS remote driven Slinger Trucks to place ¾” roadbase along a newly paved road. The HOA got a new 4” overlay of asphalt on the road and needed the roadbase material to backfill the shoulder. Bedrock’s unique equipment got this project completed in just two days and had zero impact on the freshly paved road.

Related Projects

Copyright © 2018 Ground Solutions

Bedrock slinger trucks backfilling with crusher fines around a natural gas pipeline in ColoradoBedrock’s Slinger Trucks placing draining gravel for concrete slab-on-grade preparation in Colorado