(970)-776-8150

Specialized CPT

Stone slinger truck placing washed rock for post tenson slab in Boulder CO

Client: Specialized CPT Location: Boulder, CO Service: Placing ¾” washed rock to prep for post tension slab. Details: The access was difficult, but we were able to purchase, deliver and place 60 tons in just 6 hours on a job that the client told us would normally take them a day and a half using a skidsteer.

GC Builders

Ground Solutions and Bedrock Slingers installed a perimeter drain around and backfilled this hard-to-access foundation with 500 tons of Pea Gravel and 100 tons of topsoil

Client: GC Builders Location: Residence near Horsetooth Reservoir – Fort Collins Service: Material Placement with Slinger Truck Details: We installed a perimeter drain around and backfilled this hard-to-access foundation with 500 tons of Pea Gravel and 100 tons of topsoil in a matter of just a few days.

Kubat

Slinger truck backfilling Fuel tank at Copper Mountain Ski Resort

Client: Kubat Location: Copper Mountain Ski Resort – Copper Mountain, CO Service: Pea Gravel Placement with Slinger Truck Details: We placed 3000 tons of pea gravel to bed, set and backfill 6 fuel tanks for Copper Mountain Ski Resort to be used to fill up equipment for the entire Winter ski season.

JD Enterprise

All terrain slinger placing gravel in a building in Loveland CO

Client: JD Enterprises Location: Orthopaedic & Spine Center of the Rockies addition in Loveland, CO Service: Under-slab gravel placement with All Terrain Slinger Details: We placed and laser graded 40,000 sq ft of gravel at 4” deep in this building addition in just two days utilizing our All Terrain Slinger and a 2 man grading […]

Haselden Construction

Bedrock delivered and backfilled rock into a large sewer trench with the rock slinger truck

Client: Haselden Location: Colorado State University Campus – 350 W Pitkin St, Fort Collins, CO 80521 (Global Foods Project) Service: Slinger Truck placement of ¾” rock to backfill sewer line Details: Bedrock delivered and shot 750 tons of ¾” rock into a building where the sewer line had to be replaced. We backfilled the large […]

MK Weeden

Bedrock Slingers placing 400,000 tons of material at the Glendo Reservoir in Wyoming

Client: MK Weeden Location: Glendo Reservoir – Glendo, Wyoming Service: Bedrock Slingers Rock Slinger Trucks Details: In 2014/15 Bedrock Slingers performed and completed its largest project ever to date in Glendo, Wyoming.  We placed an approximate 400,000 tons of material with our rock slinger trucks to assist in a massive water collection project at Glendo Reservoir.

Hyland Hills Parks and Recreation

Slinger truck placed stone for a water park landing area in Hyland Hills

  Client: Hyland Hills Parks and Recreation Location: Water World Service: Bedrock Slingers All-Terrain Unit Details: Client needed 150 tons of 3/4″ stone placed into landing area of new water slide. Our Bedrock Slingers all-terrain unit made it possible to place all this material directly into place and allow the contractor to keep moving on the […]

Homeowner

Bedrock Slinger's crew installed perimeter drain and backfilled with rock using slinger trucks

  Client: Homeowner Location: Livermore, CO Service: Rock Perimeter Drain Details: On a project with very limited access, after our crew installed a perimeter drain we used our Bedrock Slinger trucks to add rock onto the drain before backfilling the exterior walls.

Pierson Concrete

slinger truck allowed Bedrock Slingers to grade 4 inches of slab prep with 3/4 inch rock to prep for concrete

  Client: Pierson Concrete Location: Fort Collins, CO Service: Concrete Slab Prep Details: We laser graded 4 inches of slab prep with 3/4-inch rock to prep for concrete. This allowed the concrete workers to come in immediately after we finished and pour.

Kiewit

Bedrock Slingers aiding in building a new bridge on highway 34 in big thompson canyon by backfilling hard to reach areas to keep the project moving.

  Client: Kiewit Location: US Highway 34, Big Thompson Canyon, Loveland CO Service: Backfill Details: As part of the Highway 34 rebuild project in Big Thompson Canyon, CDOT crews moved a mountain and built a new bridge over the river at a safer location. We used one of our Bedrock Slinger trucks to backfill hard to […]

Place an Order

Material needed and estimated quantity
When the job needs scheduled for
Type of Work Needed(Required)

Get a Free Quote

  • This field is for validation purposes and should be left unchanged.